{"id":60262,"date":"2026-10-02T17:15:02","date_gmt":"2026-10-02T16:15:02","guid":{"rendered":"http:\/\/livenewsmalta.com\/?p=60262"},"modified":"2026-10-02T17:15:04","modified_gmt":"2026-10-02T16:15:04","slug":"first-of-12-oil-tanks-removed-from-san-lucjan-oil-storage-tanks-as-extensive-works-continue","status":"publish","type":"post","link":"http:\/\/livenewsmalta.com\/index.php\/2026\/10\/02\/first-of-12-oil-tanks-removed-from-san-lucjan-oil-storage-tanks-as-extensive-works-continue\/","title":{"rendered":"First of 12 oil tanks removed from San Lu\u010bjan Oil Storage Tanks as extensive works continue"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>25 tonnes of metal already removed as site moves towards regeneration<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The dismantling of the former oil storage tanks at San Lu\u010bjan, Bir\u017cebbu\u0121a is now underway, marking a major new phase in the transformation of the former industrial site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The site clearance project, entrusted to Petromal, will pave the way for the sustainable innovation hub, pledged by the Government.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Following the completion of an extensive cleaning operation earlier this year, works have progressed to the physical dismantling of the 12 tanks which were previously used for the storage of heavy fuel oil. One tank weighing 25 tonnes has already been dismantled, with the remaining structures to be removed sequentially over the coming months.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The operation follows the removal of approximately 1,200 cubic metres of oily waste sludge from the tanks during the cleaning phase. A further extensive operation has been carried out on the network of pipework across the facility, with each section systematically drained, cleaned and dismantled. Around 10,000 litres of residual oil have been recovered from the pipework.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"450\" height=\"300\" src=\"http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618a.jpeg\" alt=\"\" class=\"wp-image-60263\" style=\"width:322px;height:auto\" srcset=\"http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618a.jpeg 450w, http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618a-300x200.jpeg 300w, http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618a-150x100.jpeg 150w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><figcaption class=\"wp-element-caption\">Minister for Energy, the Environment and the Regeneration of the Grand Harbour Miriam Dalli<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Minister for Energy, the Environment and the Regeneration of the Grand Harbour Miriam Dalli, together with Petromal Chairman Ing. James Camenzuli and Bir\u017cebbu\u0121a Mayor Scott Camilleri visited the ongoing works, where she was briefed on the different phases of the decommissioning process and the preparations for the site\u2019s future regeneration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe are now seeing the physical transformation of a site which, for decades, was associated with the storage of heavy fuel oil. Our objective is not simply to remove obsolete infrastructure, but to reclaim this area and give it a new purpose that delivers environmental, social and economic value for Bir\u017cebbu\u0121a and the wider community in the Southern Region,\u201d Minister Dalli said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The dismantling is a complex operation which must be carried out carefully.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The dismantling of the tanks is expected to continue until around the end of March 2027. Works will also include the careful removal of the tank bases, testing of the underlying ground, and the dismantling of the former pump house and associated structures. Subject to the results of the environmental testing, the overall decommissioning works are expected to be completed in 2027.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The works are progressing as Government develops the next chapter for the San Lu\u010bjan site, following the conclusion of the second phase of public consultation on its future regeneration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The vision for the area includes education, innovation and technology, together with cultural, recreational and entertainment use, complemented by publicly accessible green open spaces and family-oriented facilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Photos:<\/em><\/strong> <em>MEER<\/em><\/p>\n<div class=\"pvc_clear\"><\/div><p id=\"pvc_stats_60262\" class=\"pvc_stats all  \" data-element-id=\"60262\" style=\"\"><i class=\"pvc-stats-icon medium\" aria-hidden=\"true\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" version=\"1.0\" viewBox=\"0 0 502 315\" preserveAspectRatio=\"xMidYMid meet\"><g transform=\"translate(0,332) scale(0.1,-0.1)\" fill=\"\" stroke=\"none\"><path d=\"M2394 3279 l-29 -30 -3 -207 c-2 -182 0 -211 15 -242 39 -76 157 -76 196 0 15 31 17 60 15 243 l-3 209 -33 29 c-26 23 -41 29 -80 29 -41 0 -53 -5 -78 -31z\"\/><path d=\"M3085 3251 c-45 -19 -58 -50 -96 -229 -47 -217 -49 -260 -13 -295 52 -53 146 -42 177 20 16 31 87 366 87 410 0 70 -86 122 -155 94z\"\/><path d=\"M1751 3234 c-13 -9 -29 -31 -37 -50 -12 -29 -10 -49 21 -204 19 -94 39 -189 45 -210 14 -50 54 -80 110 -80 34 0 48 6 76 34 21 21 34 44 34 59 0 14 -18 113 -40 219 -37 178 -43 195 -70 221 -36 32 -101 37 -139 11z\"\/><path d=\"M1163 3073 c-36 -7 -73 -59 -73 -102 0 -56 133 -378 171 -413 34 -32 83 -37 129 -13 70 36 67 87 -16 290 -86 209 -89 214 -129 231 -35 14 -42 15 -82 7z\"\/><path d=\"M3689 3066 c-15 -9 -33 -30 -42 -48 -48 -103 -147 -355 -147 -375 0 -98 131 -148 192 -74 13 15 57 108 97 206 80 196 84 226 37 273 -30 30 -99 39 -137 18z\"\/><path d=\"M583 2784 c-38 -19 -67 -74 -58 -113 9 -42 211 -354 242 -373 16 -10 45 -18 66 -18 51 0 107 52 107 100 0 39 -1 41 -124 234 -80 126 -108 162 -133 173 -41 17 -61 16 -100 -3z\"\/><path d=\"M4250 2784 c-14 -9 -74 -91 -133 -183 -95 -150 -107 -173 -107 -213 0 -55 33 -94 87 -104 67 -13 90 8 211 198 130 202 137 225 78 284 -27 27 -42 34 -72 34 -22 0 -50 -8 -64 -16z\"\/><path d=\"M2275 2693 c-553 -48 -1095 -270 -1585 -649 -135 -104 -459 -423 -483 -476 -23 -49 -22 -139 2 -186 73 -142 361 -457 571 -626 285 -228 642 -407 990 -497 242 -63 336 -73 660 -74 310 0 370 5 595 52 535 111 1045 392 1455 803 122 121 250 273 275 326 19 41 19 137 0 174 -41 79 -309 363 -465 492 -447 370 -946 591 -1479 653 -113 14 -422 18 -536 8z m395 -428 c171 -34 330 -124 456 -258 112 -119 167 -219 211 -378 27 -96 24 -300 -5 -401 -72 -255 -236 -447 -474 -557 -132 -62 -201 -76 -368 -76 -167 0 -236 14 -368 76 -213 98 -373 271 -451 485 -162 444 86 934 547 1084 153 49 292 57 452 25z m909 -232 c222 -123 408 -262 593 -441 76 -74 138 -139 138 -144 0 -16 -233 -242 -330 -319 -155 -123 -309 -223 -461 -299 l-81 -41 32 46 c18 26 49 83 70 128 143 306 141 649 -6 957 -25 52 -61 116 -79 142 l-34 47 45 -20 c26 -10 76 -36 113 -56z m-2057 25 c-40 -58 -105 -190 -130 -263 -110 -324 -59 -707 132 -981 25 -35 42 -64 37 -64 -19 0 -241 119 -326 174 -188 122 -406 314 -532 468 l-58 71 108 103 c185 178 428 349 672 473 66 33 121 60 123 61 2 0 -10 -19 -26 -42z\"\/><path d=\"M2375 1950 c-198 -44 -350 -190 -395 -379 -18 -76 -8 -221 19 -290 114 -284 457 -406 731 -260 98 52 188 154 231 260 27 69 37 214 19 290 -38 163 -166 304 -326 360 -67 23 -215 33 -279 19z\"\/><\/g><\/svg><\/i> <img loading=\"lazy\" decoding=\"async\" width=\"16\" height=\"16\" alt=\"Loading\" src=\"http:\/\/livenewsmalta.com\/wp-content\/plugins\/page-views-count\/ajax-loader-2x.gif\" border=0 \/><\/p><div class=\"pvc_clear\"><\/div>","protected":false},"excerpt":{"rendered":"<p>25 tonnes of metal already removed as site moves towards regeneration The dismantling of the former oil storage tanks at San Lu\u010bjan, Bir\u017cebbu\u0121a is now underway, marking a major new phase in the transformation of the former industrial site. The site clearance project, entrusted to Petromal, will pave the way for the sustainable innovation hub, [&hellip;]<\/p>\n<div class=\"pvc_clear\"><\/div>\n<p id=\"pvc_stats_60262\" class=\"pvc_stats all  \" data-element-id=\"60262\" style=\"\"><i class=\"pvc-stats-icon medium\" aria-hidden=\"true\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" version=\"1.0\" viewBox=\"0 0 502 315\" preserveAspectRatio=\"xMidYMid meet\"><g transform=\"translate(0,332) scale(0.1,-0.1)\" fill=\"\" stroke=\"none\"><path d=\"M2394 3279 l-29 -30 -3 -207 c-2 -182 0 -211 15 -242 39 -76 157 -76 196 0 15 31 17 60 15 243 l-3 209 -33 29 c-26 23 -41 29 -80 29 -41 0 -53 -5 -78 -31z\"\/><path d=\"M3085 3251 c-45 -19 -58 -50 -96 -229 -47 -217 -49 -260 -13 -295 52 -53 146 -42 177 20 16 31 87 366 87 410 0 70 -86 122 -155 94z\"\/><path d=\"M1751 3234 c-13 -9 -29 -31 -37 -50 -12 -29 -10 -49 21 -204 19 -94 39 -189 45 -210 14 -50 54 -80 110 -80 34 0 48 6 76 34 21 21 34 44 34 59 0 14 -18 113 -40 219 -37 178 -43 195 -70 221 -36 32 -101 37 -139 11z\"\/><path d=\"M1163 3073 c-36 -7 -73 -59 -73 -102 0 -56 133 -378 171 -413 34 -32 83 -37 129 -13 70 36 67 87 -16 290 -86 209 -89 214 -129 231 -35 14 -42 15 -82 7z\"\/><path d=\"M3689 3066 c-15 -9 -33 -30 -42 -48 -48 -103 -147 -355 -147 -375 0 -98 131 -148 192 -74 13 15 57 108 97 206 80 196 84 226 37 273 -30 30 -99 39 -137 18z\"\/><path d=\"M583 2784 c-38 -19 -67 -74 -58 -113 9 -42 211 -354 242 -373 16 -10 45 -18 66 -18 51 0 107 52 107 100 0 39 -1 41 -124 234 -80 126 -108 162 -133 173 -41 17 -61 16 -100 -3z\"\/><path d=\"M4250 2784 c-14 -9 -74 -91 -133 -183 -95 -150 -107 -173 -107 -213 0 -55 33 -94 87 -104 67 -13 90 8 211 198 130 202 137 225 78 284 -27 27 -42 34 -72 34 -22 0 -50 -8 -64 -16z\"\/><path d=\"M2275 2693 c-553 -48 -1095 -270 -1585 -649 -135 -104 -459 -423 -483 -476 -23 -49 -22 -139 2 -186 73 -142 361 -457 571 -626 285 -228 642 -407 990 -497 242 -63 336 -73 660 -74 310 0 370 5 595 52 535 111 1045 392 1455 803 122 121 250 273 275 326 19 41 19 137 0 174 -41 79 -309 363 -465 492 -447 370 -946 591 -1479 653 -113 14 -422 18 -536 8z m395 -428 c171 -34 330 -124 456 -258 112 -119 167 -219 211 -378 27 -96 24 -300 -5 -401 -72 -255 -236 -447 -474 -557 -132 -62 -201 -76 -368 -76 -167 0 -236 14 -368 76 -213 98 -373 271 -451 485 -162 444 86 934 547 1084 153 49 292 57 452 25z m909 -232 c222 -123 408 -262 593 -441 76 -74 138 -139 138 -144 0 -16 -233 -242 -330 -319 -155 -123 -309 -223 -461 -299 l-81 -41 32 46 c18 26 49 83 70 128 143 306 141 649 -6 957 -25 52 -61 116 -79 142 l-34 47 45 -20 c26 -10 76 -36 113 -56z m-2057 25 c-40 -58 -105 -190 -130 -263 -110 -324 -59 -707 132 -981 25 -35 42 -64 37 -64 -19 0 -241 119 -326 174 -188 122 -406 314 -532 468 l-58 71 108 103 c185 178 428 349 672 473 66 33 121 60 123 61 2 0 -10 -19 -26 -42z\"\/><path d=\"M2375 1950 c-198 -44 -350 -190 -395 -379 -18 -76 -8 -221 19 -290 114 -284 457 -406 731 -260 98 52 188 154 231 260 27 69 37 214 19 290 -38 163 -166 304 -326 360 -67 23 -215 33 -279 19z\"\/><\/g><\/svg><\/i> <img loading=\"lazy\" decoding=\"async\" width=\"16\" height=\"16\" alt=\"Loading\" src=\"http:\/\/livenewsmalta.com\/wp-content\/plugins\/page-views-count\/ajax-loader-2x.gif\" border=0 \/><\/p>\n<div class=\"pvc_clear\"><\/div>\n","protected":false},"author":2,"featured_media":60264,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","footnotes":""},"categories":[19],"tags":[],"class_list":["post-60262","post","type-post","status-publish","format-standard","has-post-thumbnail","category-local-news"],"uagb_featured_image_src":{"full":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b.jpeg",450,300,false],"thumbnail":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b-150x100.jpeg",150,100,true],"medium":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b-300x200.jpeg",300,200,true],"medium_large":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b.jpeg",450,300,false],"large":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b.jpeg",450,300,false],"1536x1536":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b.jpeg",450,300,false],"2048x2048":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b.jpeg",450,300,false],"td_0x420":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b.jpeg",450,300,false],"td_80x60":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b-80x60.jpeg",80,60,true],"td_218x150":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b-218x150.jpeg",218,150,true],"td_324x400":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b-324x300.jpeg",324,300,true],"td_696x0":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b.jpeg",450,300,false],"td_1068x0":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b.jpeg",450,300,false],"td_100x70":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b-100x70.jpeg",100,70,true],"td_265x198":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b-265x198.jpeg",265,198,true],"td_324x160":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b-324x160.jpeg",324,160,true],"td_324x235":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b-324x235.jpeg",324,235,true],"td_356x220":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b-356x220.jpeg",356,220,true],"td_356x364":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b-356x300.jpeg",356,300,true],"td_533x261":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b-450x261.jpeg",450,261,true],"td_534x462":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b.jpeg",450,300,false],"td_696x385":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b.jpeg",450,300,false],"td_741x486":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b.jpeg",450,300,false],"td_1068x580":["http:\/\/livenewsmalta.com\/wp-content\/uploads\/2026\/10\/pr261618b.jpeg",450,300,false]},"uagb_author_info":{"display_name":"Bernard Lynch","author_link":"http:\/\/livenewsmalta.com\/index.php\/author\/bernardlynch\/"},"uagb_comment_info":0,"uagb_excerpt":"25 tonnes of metal already removed as site moves towards regeneration The dismantling of the former oil storage tanks at San Lu\u010bjan, Bir\u017cebbu\u0121a is now underway, marking a major new phase in the transformation of the former industrial site. The site clearance project, entrusted to Petromal, will pave the way for the sustainable innovation hub,&hellip;","_links":{"self":[{"href":"http:\/\/livenewsmalta.com\/index.php\/wp-json\/wp\/v2\/posts\/60262","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/livenewsmalta.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/livenewsmalta.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/livenewsmalta.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/livenewsmalta.com\/index.php\/wp-json\/wp\/v2\/comments?post=60262"}],"version-history":[{"count":1,"href":"http:\/\/livenewsmalta.com\/index.php\/wp-json\/wp\/v2\/posts\/60262\/revisions"}],"predecessor-version":[{"id":60265,"href":"http:\/\/livenewsmalta.com\/index.php\/wp-json\/wp\/v2\/posts\/60262\/revisions\/60265"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/livenewsmalta.com\/index.php\/wp-json\/wp\/v2\/media\/60264"}],"wp:attachment":[{"href":"http:\/\/livenewsmalta.com\/index.php\/wp-json\/wp\/v2\/media?parent=60262"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/livenewsmalta.com\/index.php\/wp-json\/wp\/v2\/categories?post=60262"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/livenewsmalta.com\/index.php\/wp-json\/wp\/v2\/tags?post=60262"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}